Skip to content
P-001Product set · 8 sheets

Eight pillars, and none of them is a plan viewer with billing bolted on.

A subcontractor’s day runs from a drawing to a crew to a signature to a draw. SC Connect is built along that line, so the handoffs that usually cost you money — and the retyping that makes two systems disagree — stop existing.

P-101T&M extra work engine

T&M extra work engine

Capture the extra work while the crew is still standing in it, with a signature that holds up.

  • Project rate sheets — journeyman, foreman, helper — with labor burden, material markup and profit preset
  • On-glass signature capture: signature, printed name, title, UTC timestamp and GPS, taken on the foreman's phone
  • Partial approval and dispute flags, so a super can sign for hours and leave rates to the PM
  • One click turns a signed ticket into a change order and a new G703 line
A time-and-material ticket for extra work, signed on site by the general contractor’s superintendent: labor and material lines by cost code, markup, ticket total, and the captured signature with printed name, title, timestamp and GPS coordinates.
T&M-0418Riverside Medical · L3 East
Ticket line items
CodeDescriptionQtyAmount
01-100Journeyman electrician6.00480.00
01-120Apprentice6.00300.00
04-210MC cable, 12/2 · 250 ft1.00318.40
Burden 15% · material 10% · profit 10%284.76
Ticket total$1,383.16

Approved on site

Signed by
D. Marchetti · GC Superintendent
Captured
2026-09-04 15:42 UTC · 41.8781, −87.6298
P-102AIA G702 / G703 billing

AIA G702 / G703 billing

The continuation sheet builds itself, including the parts everyone gets wrong by hand.

  • Schedule of values by phase, floor, trade code and change order
  • Stored materials roll from Presently Stored in application N to Work Completed in N+1 — without double billing
  • Line-by-line retainage, and the 50% substantial completion step-down applied automatically
  • Tax exemptions and owner-direct material deductions handled on the sheet, not in a footnote
Application 7 · continuation sheetIllustrative figures
Schedule of values showing scheduled value, work completed, presently stored materials and percentage complete for each line
ItemDescription of workScheduledCompletedStored% and roll-forward
03-100Rough-in, levels 1–2486,000447,12092%
03-200Rough-in, levels 3–4412,000251,32057,68075%
05-400Gear & switchboards328,00059,040180,40073%
07-110Fixtures & trim264,00089,76023,76043%
CO-004COR 4 — added receptacles41,80041,800100%
Totals1,531,800889,040261,840less 10% retainage −88,904
Due this application$1,061,976

The redline band is material billed as presently stored. Next month it moves into work completed on its own, at the same value, and cannot be billed twice.

P-103Zero-login GC portal

Zero-login GC portal

The general contractor's super approves in thirty seconds, and never makes an account.

  • Signed magic links by email — no password, no seat, no invoice to the GC
  • Trade-protective language enclosed with every sign-off, preserved on the document
  • Forwarding is expected: a super can pass the link to their PM, and every device that opens it is logged
  • Full audit history per link, per IP, per interaction
D-03What the GC's super receives

Inbox · no account

Approve T&M-0418 — Riverside Medical, L3 East

Signature acknowledges performance of extra work and directs subcontractor to proceed. Pricing subject to final contract verification.

Review & signForward to my PM
  • 15:42:06Link opened · 172.58.x.x · iOS Safari
  • 15:42:41Signed · D. Marchetti, Superintendent
  • 16:10:22Forwarded · opened by office PM
P-104Field time & daily logs

Field time & daily logs

A foreman logs the whole crew against cost codes in under a minute, on a phone, in gloves.

  • Bulk crew entry allocating hours across multiple cost codes in one pass
  • Prevailing wage and Davis-Bacon: classifications, base rates and fringe cash or plan, tracked per worker
  • GPS weather captured at 7:00, 12:00 and 16:30 without anyone remembering to
  • Structured delay categories — trade stacking, power, failed inspection, plan conflict — with timestamped photo proof
D-04Whole crew, one pass
  • R. AlvarezJourneyman01-1006.0h03-2002.0h
  • T. BooneJourneyman01-1008.0h
  • M. IqbalApprentice01-1204.0h07-1104.0h
  • S. PetrovForeman01-0008.0h
32.0 hours · 5 cost codes00:47 elapsed
P-105Blueprints, splitting & markup

Blueprints, splitting & markup

Drop in the 200-page set; get back an indexed sheet list you can actually navigate.

  • Automatic PDF splitting with title-block OCR — sheets indexed by number and name
  • Layered vector markup: clouds, text, highlighter, calibrated measurement, photo callouts
  • Rendered on canvas with sub-second response, on the tablet that is actually on site
D-05200 pages in, indexed out
  • E-101Level 1 power plan
  • E-102Level 2 power plan
  • E-201Panel schedules
  • E-401One-line diagram
  • A-101Level 1 architectural
P-106Procurement & 3-way match

Procurement & 3-way match

Supply-house runs stop being a shoebox of receipts reconciled in March.

  • Field POs up to a configurable limit — $500 by default — issued from the truck
  • Anything over the limit routes to a PM for one-tap approval
  • Packing slips photographed and parsed: vendor, date, line totals
  • PO ↔ delivery slip ↔ vendor invoice matched before a bill ever reaches QuickBooks
D-06Three documents, one number
  • 1Field POPO-2291 · $318.40
  • 2Delivery slipOCR · $318.40
  • 3Vendor invoiceINV-88471 · $318.40

Matched. Bill released to QuickBooks.

P-107QuickBooks Online, both ways

QuickBooks Online, both ways

Not a nightly export. A mapped, idempotent, two-way sync of the money.

  • Customers, projects as sub-customers, cost codes mapped to COGS and income accounts
  • Native QBO classes and locations per project or line — divisions stay divisions
  • Retainage split automatically between accounts receivable and a retainage asset account
  • UUID idempotency keys, so a network retry never books a transaction twice
D-07Mapped, both directions
  • CustomerGC — Halloran Construction
  • ProjectSub-customer, bill with parent
  • Cost code 01-100Service → COGS / Income
  • Division: CeilingsQBO Class
  • Retainage 10%Retainage Receivable (asset)

Every write carries a UUID idempotency key, so a retry after a dropped connection finds the transaction already booked instead of booking a second one.

P-108Divisions, roles & tenancy

Divisions, roles & tenancy

One business, several trades, one set of books — without one division seeing another's.

  • Distinct trade divisions with shared accounting and isolated supervisors and cost centers
  • Roles for admin, PM, estimator, warehouse, foreman and field
  • Row-level isolation in the database itself, not a filter somebody remembered to add
D-08One business, three trades
  • Acoustical ceilings22 active
    AdminPMEstimatorWarehouseForemanField
  • Drywall & framing31 active
    AdminPMEstimatorWarehouseForemanField
  • Painting9 active
    AdminPMEstimatorWarehouseForemanField

Shared accounting connection. Isolated supervisors and cost centers. Isolation is enforced by row-level security in the database, not by a filter somebody remembered to add to a query.

P-900Full inventory

The rest of it, without the sales adjectives.

Shipped and in the product today. If something you need is not on this list, ask — a straight no is cheaper for both of us than a discovery call.

Billing & cash

  • AIA G702/G703 progress billing with generated PDF certificates
  • Schedule of values, retainage and stored-materials roll-forward
  • Change order pipeline, from field ticket to executed CO
  • WIP reporting and AR aging
  • Cash flow forecasting and executive dashboards
  • Division-level cost rollup across every job

Field & labor

  • T&M tickets — sequential immutable numbers per project, three-state approvals
  • Timecards and job costing, bulk crew entry for up to 30 workers
  • Certified payroll on federal form WH-347
  • Prevailing wage and fringe tracking
  • Daily logs with structured delay categories and GPS weather
  • Punch lists, RFIs, submittals and closeout

Materials & assets

  • Drawings — 100+ page PDF splitting, title-block OCR, viewer and markup
  • Warehouse and inventory with moving-average costing
  • Equipment and tool asset management
  • Field POs, packing-slip OCR and 3-way match
  • Proposals and estimating

Compliance & accounting

  • Document register with expiry tracking
  • Lien deadlines, and lien waivers in both directions
  • Retainage release tracking
  • QuickBooks Online sync — invoices, vendor bills, timecard weeks
  • Zero-login GC portal via signed magic links

See it on your job, not ours.

Bring a live schedule of values, a rate sheet and your QuickBooks. Thirty minutes is enough to know whether this fits how you already work.